Water & Sewer Service
Connection Site Plans

Engineered service connection site plans — water, storm and sanitary — for multiplex and residential projects. Fixture and storm loads calculated, services sized, stamped and sealed by a professional engineer (P.Eng.) and taken through municipal review to approval as part of your permit application.

Request a quote for your project

What the work covers

Scoped per project, but this is what a package normally includes.

Service sizing

Water service sized from the building’s peak domestic water demand — and from the sprinkler demand where the building is sprinklered, since both draw on the one connection. The storm connection is sized from the drainage area and the sanitary connection from the fixture count.

Connection site plan

Existing and proposed water, storm and sanitary connections set out against the property line, the survey and the municipal main, with invert levels where the connection depth governs. The proposed water service location is shown on the plan and the final drawing is signed and sealed by a BC-registered professional engineer.

Utility coordination

Existing services located and conflicts resolved before excavation, including the gas utility where its plant is in the way.

Review & deficiency response

Comments from the municipality answered and the drawing revised until it is accepted.

Where we work

Projects throughout British Columbia, with most work in Metro Vancouver.

VancouverBurnabySurreyRichmondCoquitlamNorth VancouverWest VancouverNew WestminsterDeltaPort CoquitlamMaple Ridge& surrounding

Common questions

If yours is not here, call or send the drawings and we will answer directly.

What do you need from me to start?

A survey with grades and property boundaries, the architectural site plan, and the fixture count or floor plans. The survey is the one that holds things up most often — the connection drawing is set out from it, so it cannot be drawn properly without one.

How many rounds of revisions should I expect?

Plan on at least one. Municipal review commonly returns comments on service sizing, connection location or conflicts with existing plant, and the drawing is revised in response. That back-and-forth is part of the job and we carry it through to acceptance rather than handing it back to you.

What about existing gas, water or other utilities on site?

They get located and coordinated before anything is dug. Where a proposed connection conflicts with existing utility plant, that has to be resolved on the drawing — finding it in the trench is expensive and delays the connection.

What does the City of Vancouver ask for on a commercial water connection?

A site plan showing the proposed water service location, prepared and sealed by a BC-registered professional engineer, and mechanical details showing the plumbing configuration and the building’s peak domestic water demand. We produce the site plan, and where the plumbing design is ours as well, the mechanical details come out of the same package. Requirements vary by municipality and by project, so send us what you were asked for.

Is my project a residential or a commercial connection permit?

In the City of Vancouver it depends on the building type, and the wording catches people out. A single detached house — with or without a laneway house or secondary suite — a duplex, or a laneway house on its own is one combined residential permit. A multiplex, a duplex with an infill dwelling, anything over three dwelling units, and commercial or industrial buildings need two separate commercial permits, one for sewer and one for water, because the connections are larger. Multiplex clients are usually surprised their project counts as commercial. Other municipalities divide it differently, so we check which applies before drawing.

The City says I need a sealed site plan for my service connection — is this it?

Yes. Municipalities word it differently — a service connection drawing, a water and sewer connection site plan, an engineered site plan — but it is the same thing: the connection layout drawn to the municipal standard and sealed by a professional engineer, submitted with your permit application. The City of Vancouver and each municipality have their own standards and we draw to whichever applies. Send us the wording you were given.

Does a sprinkler system change the water service size?

Yes, often decisively. A sprinklered building draws its fire demand through the same service as its domestic water, so the connection has to carry both. That is why the sprinkler hydraulic calculation and the connection sizing need to be done against each other rather than in isolation — a service sized on fixture count alone can turn out too small once the sprinkler demand is added, and upsizing it after the connection is in is expensive.

Do these drawings need an engineer's seal?

For the municipal submission, yes — the connection site plan is sealed by a professional engineer (P.Eng.). Where the work also falls under a building permit, the Letters of Assurance — Schedules B and C-B — are issued for the mechanical discipline alongside it.

Is this the same as plumbing design?

No, though they are related and often done together. Plumbing design covers the system inside the building. The connection site plan covers what happens between the building and the municipal main in the street — and it is a separate permit submission.

Other services

Most projects need more than one of these, and they are coordinated together.

Ready to start
your next project?

Tell us what you are working on and we will come back with a scope and a price — and ask for drawings if we need them.